
Service Upgrade
Savant Power Modules turn flexible loads off for a while so the house stays within its service size. Savant's service upgrade avoidance was approved in October 2026, so a home whose load calculation works can add an EV charger or heat pumps without a bigger service.
Try the demoWhy do homes need bigger services?
Try it
How does load shedding work?
Switch on the loads in this 200 A house. When the total would go past the service, Savant Power Modules pause the lowest-priority loads first and keep the rest running.
The house is drawing 125 amps of its 200 amp service. Nothing needs to be paused.
A teaching example with rough figures. A real design starts with your electrician's load calculation, and the priorities are set with you when the system is commissioned.
What does Savant Power do differently?

EV charging
What about the EV charger?
How do we decide if it works for your house?
What does the electrical code say?
Will it work for your house?
Tell us your service size and what you are adding. We call to talk it through and set up a site visit.
Keep reading
Service Upgrade Questions
Can Savant Power keep me from upgrading from 200 A to 400 A?
Can Savant Power keep me from upgrading from 200 A to 400 A?
Yes, when the house's load calculation works. Savant's service upgrade avoidance was approved in October 2026. Savant Power Modules turn flexible loads off for a while so the house stays within its service size, which can let the electrician size the service for the managed load instead of everything running at once. Each home still needs its own load calculation, and the electrician, the inspector and the utility sign off. We find out on the site visit.
Does the electrical code allow it?
Does the electrical code allow it?
The 2023 National Electrical Code, which Massachusetts adopted in 2023, added section 220.70 for energy management systems. When a system limits the current on a service or feeder, the load calculation can use the system's maximum setpoint instead of the full connected load. Whether a particular design counts under that section is up to your electrician and the inspector.
What gets turned off, and for how long?
What gets turned off, and for how long?
Only the loads you agree can wait, in the order you choose. Typical choices are the EV charger, a spa or pool heater, a dryer or a second water heater. They come back on when the house has room again, usually within minutes. Lights, outlets, the refrigerator and the network are never shed.
Will I notice when it happens?
Will I notice when it happens?
Rarely. It only acts when several large loads run at the same time, such as the oven, the dryer, the heat pumps and the EV charger on a cold evening. The Savant app shows each circuit's history and sends notifications, so you can see what the house was doing.
What does avoiding an upgrade save?
What does avoiding an upgrade save?
A service upgrade can involve a new meter, new service wire, a new main panel, utility scheduling and permits, so it is often a large cost and a long wait. Savings depend on the house and the utility, so we compare both paths in the written proposal.
Does it work with a 400 A or 600 A service?
Does it work with a 400 A or 600 A service?
Yes. The same approach applies at any size. A 400 A home adding a pool house and EV chargers can stay at 400 A instead of moving to 600 A when its load calculation works, with the electrician, the inspector and the utility signing off.
Stay on the Service You Have?
Tell us what you are adding to the house. We look at the load calculation and show you both paths.
